HOTEKEYGuangzhou Hotekey Electronics · Hotel Room Control
Back to home

Laos Luang Prabang Wanda Jinhua Resort: 145-room Smart Room Control Full-case Delivery

Project type: Overseas resort room control | Scale: 145 rooms | Solution: HOTEKEY Room Control System (RCU) | Location: Laos · Luang Prabang

This is HOTEKEY's benchmark signed project for its Southeast Asia expansion. We provided the Laos Luang Prabang Wanda Jinhua Resort with a complete guest-room smart control system covering 145 rooms, combining RCU high-voltage control, card-free power, door-contact linkage, motorized curtains, DuerOS voice and cloud-platform management — delivering a remotely operable, software-defined room-control foundation.

Disclosure note (read first)
This case is based on the project's executed Room Control System List (2026-10-12 edition). The room count, room-type mix, per-room device points, and delivery & commercial terms are real list data. Energy-saving figures are system design capabilities (auto power-off when unoccupied, supply-on-demand); actual savings are subject to the project's completion acceptance measurement — this page makes no quantified commitment.

1. Project Overview

ElementContent
Hotel nameLaos Luang Prabang Wanda Jinhua Resort
LocationLaos · Luang Prabang
Total rooms145 rooms
Room-type mixBldg 1/2 king 30, Bldg 1/2 twin 22, Bldg 3 king 12, Bldg 3 twin 76, family room 2, bathtub suite 2, presidential suite 1
System compositionRCU room control + card-free power + door-contact linkage + motorized curtains + DuerOS voice + wireless gateway to cloud + management console
Panel specAtour-grey color, Chinese/English printing, combined faceplates (3-/4-/5-gang)

2. Standard Per-room Points (standard-room basis)

SubsystemDevicePer roomNote
High-voltage control12-channel high-voltage loop controller (no gateway)112 loops, parameters stored distributed in the in-room host
High-voltage controlSingle-channel loop controller3Vanity light strip, curtain light strip, chandelier, etc. into room control
AC interfaceIR module1IR control of ducted AC
Power logicSmart power module1Triggered by door-contact linkage, judges occupied/unoccupied
Power logicWired door contact1Door-contact scene, activates unoccupied judgment (core)
Card-free power24G human-presence sensor1Anti-interference, low false trigger, always powered
Card-free powerIR human sensor1Above the bathroom, always powered
CommsWhite wireless gateway (with PSU)1BLE / Wi-Fi, into room-control cloud, uninterrupted power
CurtainsCurtain motor1Always powered (motorized track client-supplied, 82 type)
VoiceDuerOS hotel smart speakerOptionalVoice control of lights / curtains / TV / AC
SoftwareRoom control management system + cloud service + engineering debug1 set / hotelBack-office device management, real-time status, logic delivery

3. Key Technical Capabilities (GDO decision evidence)

1. Card-free power + door-contact linkage, precise occupied/unoccupied judgment

Using 24G human-presence + IR dual sensing, together with a wired door contact, the room keeps supplying power while presence is sensed within the set time, and enters energy-saving power-off logic when unoccupied — the source mechanism of hotel room-control energy saving.

2. Distributed RCU — control survives network outage

The 12-channel high-voltage controller + single-channel controller push control logic down to the in-room host: a network-device fault does not affect on-site control of each room; a fault in any loop does not affect other devices; control parameters are stored in the in-room host, so data is not lost on power loss (memory retained).

3. Software-defined, no rewiring

Logic tweaks are done purely by software and pushed from the console, with no need to change wiring; the system is highly extensible, and new devices report status in real time from the console.

4. Integrated voice and curtains

DuerOS hotel voice controls lights / curtains / TV / AC; the curtain motor is always powered, the track is client-supplied, and we handle the motor and linkage.

Core mechanism: all device status reported in real time + queryable from the console — the hotel engineering team can centrally operate and maintain 145 rooms' devices from the back office, lowering inspection and fault-location cost.

4. Delivery & Commercial Terms (real list wording)

TermContent
Production lead timeMass production 20–30 working days after signing & payment; mock-up 2–5 days
Payment50% prepaid on device order; balance to 100% before shipment
Quote scopeExcludes freight, wall boxes and wiring, installation labor, and our personnel's travel/accommodation
ShippingDomestic freight logistics
Added devicesCharged at unit price

Want the same overseas hotel room-control solution?

Share your hotel scale and room types and we can output a room-control point list and delivery schedule.

Get a customized solution

Data source: Laos Luang Prabang Wanda Jinhua Resort Room Control System List (2026-10-12 edition). Energy saving is a system design capability; actual savings are subject to completion acceptance measurement.