English
Case Study

Mehood Lestie Hotel, Shitan, Zengcheng

A Bluetooth Mesh guest room control retrofit across 121 guest rooms - lighting scenes, air conditioning, motorised curtains and voice control, delivered in September 2026

Discuss a Similar Project
121
guest rooms
Bluetooth Mesh
control retrofit
Shitan, Zengcheng
Guangzhou, China
September 2026
completed

Project Background

A full property renovation with the room control system upgraded alongside

Scope of the retrofit

The hotel is located in Shitan Town, Zengcheng District, Guangzhou. During a full renovation the guest room control system was upgraded across 9 floors (6F-14F) and 121 guest rooms, spanning nine room types including superior king, superior twin, executive king, business suites, family rooms, mahjong rooms and round-bed rooms.

Retrofitting control in an existing hotel differs fundamentally from a new build: old panels must come out, existing cabling stays, and finished interiors cannot be opened up. That tests both product adaptability and on-site execution.

Hotel guest room interior

The Challenges

Out with the old, many floors and room types, a tight window, one-shot delivery

  • Out with the old, without breaking the new - existing panels had to be removed and replaced beneath finished ceilings and walls, demanding careful protection of completed finishes.
  • Many floors, many room types - 121 rooms across 9 floors and 9 room types, each with different control points and scene logic, requiring per-type schedules and consistent commissioning.
  • A tight retrofit window - works had to fit the wider renovation programme while minimising rooms taken out of service.
  • One-shot delivery - retrofit projects rarely allow repeated rework; the system must be operational from handover.
Guest room control retrofit on site

The Hotekey Solution

A full Bluetooth Mesh kit across 121 rooms, retrofitted with existing cabling retained

Bluetooth Mesh wireless gateway

One per room, providing room-level mesh networking and cloud connectivity; no new control cabling is added during the retrofit.

AC thermostat and curtain motor

Local temperature and fan-speed control, plus a Bluetooth Mesh curtain motor (1.2 N, driving centre-opening curtains up to 7 m) on a quiet track.

Scene panels, key-card switch and door plate

1 / 2 / 3 / 4 / 6-button panels covering corridor, bathroom, mirror, exhaust fan, bedside reading and LED strips, with Sleep / Soft / Bright / Leisure scenes, plus a key-card power switch and a 3-in-1 door plate.

Voice control and cloud platform

An in-room Xiaodu smart speaker for voice control of AC, curtains and lighting, with devices connected to the Hotekey cloud platform for remote maintenance.

Project Value

  • No re-cabling - existing cabling retained; only panels and devices swapped, avoiding wall chasing and minimising disturbance.
  • A consistent upgrade across 121 rooms - nine room types configured individually yet delivered uniformly for standardised operations.
  • Lighting, AC, curtains and voice in one system - a single control layer managing multiple in-room systems.
  • Cloud-connected for remote maintenance - device status in the cloud, with remote configuration and firmware updates.
Confirmed scope: a full Bluetooth Mesh room control kit - wireless gateways + AC thermostats + BLE Mesh curtain motors and tracks + key-card switches + 3-in-1 door plates + scene panels + sockets (incl. USB / Type-C UPS) + Xiaodu voice speakers, across 121 guest rooms, including removal of old panels, installation and commissioning.
Not included in this scope: wired RCU controller, KNX lighting, knob panels / smart displays, public areas, and hotel PMS integration.
Hotekey control panels and switches

Planning a Hotel Guest Room Control Project?

Send us your room count, brand standard and project timeline - we return product selection advice, a system topology and a quotation.

Contact Hotekey